Uncertainty Analysis of the Potential Hazard of MCCI during Severe Accidents for the CANDU6 Plant

Table 1

Timings of key events for the station blackout scenario base case in the Wolsong-1 plant (based on ISAAC calculation).

EventTime (base case)
hours, (seconds)

SG inventory depletion2.8 (10,032)
Pressure tube rupture4.0 (14,272)
CFVS first open6.7 (24,034)
Calandria vessel inventory depletion11.5 (41,558)
Calandria vessel failure45.6 (164,188)
Calandria vault inventory depletion49.3 (177,502)
Calandria vault floor rupture101.0 (363,473)
Reactor building failure102.4 (368,484)

We are committed to sharing findings related to COVID-19 as quickly as possible. We will be providing unlimited waivers of publication charges for accepted research articles as well as case reports and case series related to COVID-19. Review articles are excluded from this waiver policy. Sign up here as a reviewer to help fast-track new submissions.