Study of the Reactor Control System of MSHIM in AP1000

Table 2

Five performance indices from the 5% FP/min ramp load decrease simulation of the original and modified power control system in MSHIM.

Performance indicesM-StepsAO-Steps

Original 196.275.431.16055409
Modified 24.725.381.16025789