Research Article

Normal and Accidental Scenarios Analyses with MELCOR 1.8.2 and MELCOR 2.1 for the DEMO Helium-Cooled Pebble Bed Blanket Concept

Figure 15

Mass flow rates through the inlet and the outlet blanket pipes in M 2.1 for the base and the modified cases.