Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach
Table 3
The experimental results (minimal tardiness time).
| Minimal tardiness time | (Number of nuclear power plants, number of construction teams, and number of reactor installation teams) | (6, 1, 1) | (6, 2, 1) | (6, 1, 2) | (6, 2, 2) | (6, 2, 3) | (6, 3, 2) |
| The optimal solution of LINGO 11 | 2004 | 740 | 1008 | 265 | 151 | 72 | The solution of the proposed method | 2004 | 740 | 1008 | 265 | 151 | 72 |
|
|