| Plant | (Lower bound, upper bound, weight, construction time, and reactor installation time) |
| N1 | (40, 86, 1, 40, 1) | N2 | (40, 84, 1, 40, 1) | N3 | (40, 72, 1, 40, 1) | N4 | (46, 96, 0.5, 40, 1.5) | N5 | (40, 72, 1, 46, 1.5) | N6 | (40, 84, 0.5, 42, 1.5) | N6 | (40, 72, 0.5, 42, 1.5) | N7 | (48, 72, 0.5, 42, 1.5) | N8 | (48, 72, 0.5, 42, 1.5) | N9 | (48, 72, 0.5, 42, 1.5) | N10 | (48, 72, 0.5, 46, 1.5) | N11 | (48, 120, 0.5, 42, 1.5) | N12 | (48, 120, 0.2, 46, 1.5) | N13 | (48, 120, 0.2, 42, 1.5) | N14 | (48, 120, 0.2, 42, 1.5) |
|
|