Research Article

Using CFD as Preventative Maintenance Tool for the Cold Neutron Source Thermosiphon System

Table 1

Experimental parameters for the PNPI tests.

VariableDescriptionMeasurement uncertainties

DT1, (K)D2 temperature before HX
DT2, (K)D2 temperature after HX
DT3, (K)D2 temperature after moderator
HeT1, (K)He temperature to moderator
HeT2, (K)He temperature to HX
HeT3, (K)He temperature after hot leg
HeF1, (g/s)He mass flow rate to moderator
HeF2, (g/s)He mass flow rate to HX
HeF3, (g/s)He mass flow rate after hot leg
, (K) average temperature, i.e., of moderator cell
HeQ, (W)Heat load on He
DQ, (W)Heat load on D2
HeQTotTotal He heat removal

Note: HX: heat exchanger; D2: deuterium, He: helium.