The Investigation of Nonavailability of Passive Safety Systems Effects on Small Break LOCA Sequence in AP1000 Using RELAP5 MOD 4.0

Table 1

Actuation set-points and time delay assumption considered for AP1000 LOCA [4].

System/functionActuation set-pointsTime delay (sec)

Reactor trip12.41 MPa2
“S” signal generation11.72 MPa2
SG feedwater valves start closingAfter reactor trip signal3.2
Main steam isolation valves start closingAfter “S” signal4.8
Reactor coolant pumps tripAfter “S” signal6
PRHRS isolation valve opensAfter “S” signal0
CMT actuationAfter “S” signal0
Accumulator actuation4.83 MPa0
ADS-1 actuationAfter CMT water volume reduces to 67.5%20
ADS-2 actuation70 s after ADS-1 actuation30
ADS-3 actuation120 s after ADS-2 actuation30
ADS-4a actuation20.0% liquid volume fraction in CMT2
ADS-4b actuation60 s after ADS-4a actuation2
IRWST injectionPressure < 89.6 kPa + containment pressure2