Power factor of equipment in nuclear power plant.

ItemsTechnical quantityPower factor ()

NSSS main componentThermal power (MWt)0.5
Main turbineElectric power (MWe)0.62
PumpFlow rate (gpm)0.63
Tank
 NSSSCapacity0.8
 BOPCapacity0.65
Heat exchange
 NSSSHeat transfer rate0.5
 BOPHeat transfer rate0.51
BlowerCapacity (cfm)0.77
AHU, ACUCapacity (cfm)0.75
Air compressorCapacity0.78
Cubicle coolerCapacity0.71
FilterFlow rate (gpm)0.62
DemineralizerFlow rate (gpm)0.6
FW heaterFlow rate (gpm)0.55
Emergency D/GPower (kW)0.6
ChillerCapacity (RT)0.74
CraneCapacity (TN)0.6
Aux boilerCapacity (b/hr)0.6
TransformerMVA0.6
BatteryAMP0.6
SwitchgearBKR0.6
ChargerAMP0.6