Research Article
RELAP5 Simulation of PKL Facility Experiments under Midloop Conditions
Table 2
E3.1, F2.1, and F2.2 accident management measures (Phase II).
| | PKL III E OECD-SETH | PKL III F OECD-PKL | PKL III F OECD-PKL | | E3.1 | F2.1 Run 1 | F2.1 Run 2 | F2.2 Run 1 |
| Safety systems injection | | | LPIS | |
| Accumulators injection sequence | Cold leg 1 | Hot leg 1 | Hot leg 1 | Hot leg 1 | Cold leg 2 | Cold leg 2 | Cold leg 2 | Hot leg 2 | Cold leg 3 | Cold leg 3 | Cold leg 3 | Hot leg 3 | Cold leg 4 | Hot leg 4 | Hot leg 4 | Hot leg 4 | Cold leg 4 | | | |
| Depressurization | | SG secondary valves | SG secondary valves | | PRZ valves | PRZ valves |
| Safety systems injection | | LPIS | LPIS | | | HPIS | HPIS |
|
|