Table 7

Parametric study on the CRDA of control rod 15 at BOC.

CR15 at BOCTime step (s)Scram signal (% FP)Scram delay (s)Drop time (s)Max relative powerMCST (K)MFCLT (K)

Case : reference0.021150.60.81.3321148.72535.6
Case : time step decrease0.0051150.60.81.3311147.62533.1
Case : scram signal0.021200.60.81.3321152.42544.4
Case : scram delay0.021151.20.81.3321173.22587.5
Case : drop time0.021150.60.41.38931148.42540.1
Case : time step increase0.11150.60.81.3441149.32536.2