Research Article

A Conceptual Approach to Eliminate Bypass Release of Fission Products by In-Containment Relief Valve under SGTR Accident

Table 2

Accident sequences in the base case.

Accident sequenceSGTR base (s)

Accident start0
MFW trip2,654 (0.74 h)
Reactor trip2,654 (0.74 h)
MSSV open2,654 (0.74 h)
RCP trip2,672 (0.74 h)
Oxidation start12,437 (3.45 h)
Gap release12,644 (3.51 h)
Cladding melting13,872 (3.85 h)
Melt relocation14,328 (3.98 h)
RPV failure21,406 (5.94 h)