Main sequence of events [
11].
| Event | Time (hh:mm:ss) |
| Loss of offsite load | 10:27 | Turbine overspeed protection started (closure of turbine governor valves with steam dump valve opening) | 10:27:0 | Alarm ROD BANK LO-LO LIMIT | 10:28:18 | Safety injection signal | 10:29:02 | “Unusual event” was declared | 10:55 | Diesel generator number 1 (2) stopped | 11:20 (11:34) | Reactor coolant pump number 1 restarted | 11:55 | Plant transited to a “hot standby” mode, the termination of “unusual event” was declared | 12:15 |
|
|
from measured data; LO: low; LO-LO is also called LO-2. |