Research Article
RELAP5/MOD3.3 Analysis of the Loss of External Power Event with Safety Injection Actuation
Table 3
Scenarios simulated by RELAP5 in the first step (till SI injection signal actuation).
| Scenario | Name |
| Base case (assuming above initial and boundary conditions) | Base | Base case without assuming influence of turbine-generator frequency on RCP flow | w/o frequency | Base case without disabled rate sensitive pressurizer PORV opening | With PRZ PORV | Base case without assuming any boration | w/o boration | Base case (assuming main feedwater system in automatic mode) | w/o operator FW |
|
|