Research Article
Validation of Modified ART Mod 2 Code through Comparison with Aerosol Deposition of Cesium Compound in Phébus FPT3 Containment Vessel
Table 8
Design conditions of containment vessel, dry condenser, and wet condenser in ART Mod 2.
| Design conditions | Containment vessel volume | Dry condenser part volume | Wet condenser part volume |
| Diameter [m] | 1.77 | 0.90 | 0.90 | Height [m] | 4.07 | 0.71 | 1.64 | Total Area [m2] | 27.52 | 1.01 | 2.32 | Total Volume [m3] | 10 | 2.01 | 4.65 |
|
|