Research Article

Validation of Modified ART Mod 2 Code through Comparison with Aerosol Deposition of Cesium Compound in Phébus FPT3 Containment Vessel

Table 9

Design conditions of containment zone, dry condenser zone, and wet condenser zone in RELAP5 Mod 3.3.

Design conditionsContainment vessel zoneDry condenser part zoneWet condenser part zone

Diameter [m]1.771.771.77
Height [m]1.710.711.64
Total Area [m2]9.493.969.13
Total Volume [m3]4.201.764.04