Research Article

A Methodology for Optimizing the Management of Spent Fuel of Nuclear Power Plants Using Dry Storage Casks

Table 6

Sensitivity analysis for the optimization algorithm using the adapted source.

Dose Rate Limit  
0.2 mSv/h
Concrete cost per m3 (M.U.)
10010005000
Optimal Time  
(months)
Concrete Thickness  
(mm)
Optimal Time  
(months)
Concrete Thickness  
(mm)
Optimal Time  
(months)
Concrete Thickness  
(mm)

Pool cost per stored Fuel Assembly  
(M.U.)
0.5433300.000720299.709720299.709
1433300.000601299.788720299.709
25121343.877433300.000433300.000
5061360.956433300.000433300.000
7561360.955433300.000433300.000
10013389.405433300.000433300.000
50013389.40561360.956433300.000
100013389.40513389.405121343.877

Dose Rate Limit 4  
mSv/h
Concrete cost per m3 (M.U.)
10010005000
Optimal Time  
(months)
Concrete Thickness  
(mm)
Optimal Time  
(months)
Concrete Thickness  
(mm)
Optimal Time  
(months)
Concrete Thickness  
(mm)

Pool cost per stored Fuel Assembly  
(M.U.)
1720288.610720288.610720288.610
1013299.670720288.610720288.610
5013299.67013299.670720288.610
7513299.67013299.670613290.050
9013299.67013299.670121297.002
10013299.67013299.67061298.003
25013299.67013299.67013299.670
20013299.67013299.67013299.670