Research Article

A Methodology for Optimizing the Management of Spent Fuel of Nuclear Power Plants Using Dry Storage Casks

Table 7

Optimal result data for a given set of example parameters with 4 mSv/h as the dose rate limit.

SourceAdapted

Dose Rate Limit4 mSv/h

Cubic Meter of Concrete Unit Cost5000 M.U.

Storage Cost per Fuel Assembly in the Pool90 M.U.

Optimal Initial Cooling Time121 months

Optimal Shielding Thickness297.002 mm

Spent Fuel Pool Minimal Capacity400 Fuel Assemblies

Spent Fuel Pool Cost3600 M.U.

Dose Rate at 1 m from Cask Surface4 mSv/h

Concrete Volume for Whole Cask Array11.15 m3

Cost of Whole Cask Array6.9126 x 106 M.U.

Cost per Fuel Assembly Stored Dry2787.33 M.U.