RELAP5 Foresight Thermal-Hydraulic Analysis of Hypothesis Passive Safety Injection System under LOCA for an Existing NPP in China

Table 3

10-inch SBLOCA transient sequence of the accident.

EventTime (s)

Break occurs0.0
Reactor trip signal2.0
ā€œSā€ signal3.0
RCPs begin to coast down8.0
ACC injection begins62.0
ACC-1 empties350.0
ACC-2 empties350.0
ADS stage 1524.0
ADS stage 2882.0
CMT-1 empties1112.0
CMT-2 empties1374.0
HET injection begins882.0