Research Article

Technical Options and Cost Estimates for Spent Nuclear Fuel Management at the Barakah Nuclear Power Plants

Table 13

Converted (ON = 1 and OFF = 0) operation mode options with total cost values of facilities (million USD) in the Barakah site.

Operation mode
OptionsBarakah-1Barakah-2Barakah-3Barakah-4Total

Option 1501.0501.0501.0501.02004.0
Option 2427.1427.1427.1427.11708.4
Option 3928.1928.1928.1928.13712.4
Option 4501.0501.0501.0501.02004.0
Option 5537.9537.9537.9537.92151.4
Option 6464.0464.0464.0464.01855.8
Option 7965.0965.0965.0965.03859.8
Option 816.916.916.916.967.8
Option 9517.9517.9517.9517.92071.8
Option 10444.1444.1444.1444.11776.2
Option 11945.0945.0945.0945.03780.2
Option 1253.853.853.853.8215.2
Option 13554.554.554.554.2219.2
Option 14480.9480.9480.9480.91923.6
Option 15981.9981.9981.9981.93927.6