Research Article
Technical Options and Cost Estimates for Spent Nuclear Fuel Management at the Barakah Nuclear Power Plants
Table 16
Summarized comparison with other case studies.
| ā | Reference year | Inflation rate | Escalated rate | Discount rate | No. of operation options | Cost category |
| This case study | 2020 | 1.2 | 3 | 1.5 | 15 | 6 | Al Saadi [3] | 2014 | NC | NC | 5% | 2 | 2 | Penalonga [5] | 2017 | NC | NC | 1.5 | 4 | 6 | Aubert [28] | 2005 | 2 | NC | 3 | 2 | 5 | Penalonga [31] | 2017 | NC | NC | 1.5 | 4 | 6 | Maxwell [50] | 2017 | 2 | 3 | 2.1 | 4 | 4 | Hyung [51] | 2014 | NC | NC | NC | 8 | 5 |
|
|
|