Research Article

Source Term Estimation under the SBLOCA-Induced Severe Accident Condition in the SMART

Figure 9

(a) Total accumulated flow through the break area and the automatic depressurization system from the reactor vessel from the start of gap release; (b) pressure in the reactor vessel.
(a)
(b)