Studies on Optimal Strategy to Adopt Nuclear Power Plants into Saudi Arabian Energy System Using MESSAGE Tool

Table 3

The characteristic parameters of candidate nonnuclear PPs assumed in this study [6773] (1).

Power plantRegionConstruction timeEfficiencyLifetimeCapacity factorCapital costVariable O&M costFixed O&M cost
(yr)(%)(yr)(%)(U$/kWe)(U$/MWh)(U$/kWe/yr)

A-CC-PPEast, west2583580891022.3
A-GT-PPSouth2433590546016.4
A-ST-PPCenter, east2422590874017.5
WT-PPWest127255068310.4307.4
WD-PPWest, east250254211980.128.7
GH-PPSouth21540656038092
SL-PPPV center, east, west12230251021.6023
CSP center, east, west1402534630014.5
CL-PPEast24340801725023
PSH-PPWest28050471408025

(1) Currency exchange rate of 1 € euro = 1.15 U$ is applied based on the conversion assumed in the MESSAGE tool.