Research Article

Studies on Optimal Strategy to Adopt Nuclear Power Plants into Saudi Arabian Energy System Using MESSAGE Tool

Table 4

The operational parameters of candidate NPPs assumed in this study [33, 48ā€“58].

Power plantTh-P (MWt)Cn-T (yr)Th-E (%)L-T (yr)Ca-F (%)FB (GWtd/MTHM)SP (MWt/MTHM)CC (U$/kWe)NC (#)FOM (U$/MWh)

SMART-1003003336090403310000132.4
APR-1400390000633609042.237. 95714120.9

Th-P (MWt): thermal power, Cn-T (yr): construction time (yr), Th-E (%): thermal efficiency (%), L-T (y): lifetime (yr), Ca-F (%): capacity factor (%), FB (GWtd/MTHM): fuel burnup (GWtd/MTIHM), SP (MWt/MTHM): specific power (MWt/MTHM), CC (U$/kWe): capital cost (U$/kWe), NC(#): number of cycles (#), and FOM (U$/MWh): fuel, operation, and maintenance cost of the reactor (U$/MWh).