Research Article
Verification of the Efficacy of Passive Autocatalytic Recombiners in a Typical Pressurized Water Reactor under a Station Blackout Condition
Table 9
Effect of external injection flow rate and time delay (depressurization at core uncovery).
| Ext. injection flow rate (kg/s) | Time delay from SIT depletion (s) | 0 | 6000 | 9000 | 12,000 | 15,000 |
| 1/6 flow (6.25) | 400.84 kg H2 | 399.64 kg H2 | 399.64 kg H2 | 399.64 kg H2 | 399.64 kg H2 | Half flow (18.75) | 399.95 kg H2 | 399.64 kg H2 | 399.64 kg H2 | 399.64 kg H2 | 399.64 kg H2 | Full flow (37.5) | 399.94 kg H2 | 399.64 kg H2 | 399.64 kg H2 | 399.64 kg H2 | 399.64 kg H2 |
|
|