Research Article

Seismic Response Reduction of Structures Equipped with a Voided Biaxial Slab-Based Tuned Rolling Mass Damper

Figure 1

Construction procedures for a hollow-ribbed floor. (a) Locate prefabricated hollow box-like modules between the reinforcement grids. (b) Cast reinforced concrete beams between the box-like hollow modules.
(a)
(b)