Research Article

A Comparative Study of Ground and Underground Vibrations Induced by Bench Blasting

Table 2

Vibration measurements taken in tunnel.

BlastBench, maximum charge by delay (kg), distance (m)PPV (mm/s)Frequency (Hz)

16281743130.714.6

262817510215.131.1
17513214.332.3
1751726.332.3

36281752621.332.9
1752172.133.9
1751415.232.9
1751203.132.3

462817510715.032.9
1751444.732.9
1751865.832.9

56281753352.331.7
1752282.132.9
1752076.332.9

66281732671.630.5

76281752056.216.5
1751324.331.7
1751417.633.6

86281752591.529.9
1752115.433.6

96281752362.934.3
1751543.935.4

106281751764.535.4

116161751405.135.4
17512715.933.5

126281751753.835.4
1751713.233.6

13628173104 3.962.0
1732527.133.6

146161741415.732.3
1741086.235.0
1749513.533.6

156281752024.834.2

166281732305.561.0
17310724.588.8
1739912.595.2

176281751943.934.2