Research Article
Numerical Evaluation on Dynamic Response of Existing Underlying Tunnel Induced by Blasting Excavation of a Subway Tunnel
Figure 7
Blasting load applied to excavation contour. (Note. Peak load at is 53.6 MPa, and = 2.3 ms and = 17.0 ms, as calculated according to Lu et al. [24].)