Research Article
Excavation Method of Reducing Blasting Vibration in Complicated Geological Conditions
Table 3
Maximum PPV of each key control protected object using 6 types of blasting excavation method in I phase underground powerhouse.
| Scheme | Charge (kg) | Generator layer (cm/s) | Turbine layers (cm/s) | New pouring concrete (cm/s) |
| Draw cut of deep hole | 24.0 | 0.92 | 0.68 | 2.57 | Draw cut of shallow hole | 10.8 | 0.44 | 0.43 | 1.71 | Presplitting blasting of deep hole | 12.0 | 0.22 | 0.18 | 0.75 | Presplitting blasting of shallow hole | 7.3 | 0.16 | 0.13 | 0.60 | Draw cut blasting with presplitting gap | 24.0 | 0.89 | 0.63 | 2.43 | Draw cut with damping ditch | 24.0 | 0.31 | 0.21 | 0.83 |
|
|