Maximum PPV of each key control protected object using 6 types of blasting excavation method in I phase underground powerhouse.

SchemeCharge (kg)Generator layer (cm/s)Turbine layers (cm/s)New pouring concrete (cm/s)

Draw cut of deep hole24.00.920.682.57
Draw cut of shallow hole10.80.440.431.71
Presplitting blasting of deep hole12.00.220.180.75
Presplitting blasting of shallow hole7.30.160.130.60
Draw cut blasting with presplitting gap24.00.890.632.43
Draw cut with damping ditch24.00.310.210.83