Research Article

Excavation Method of Reducing Blasting Vibration in Complicated Geological Conditions

Table 5

Safety control standard of blasting vibration in Fengning pumped storage power station.

Protected projectsMinimum distance (m) Standard (cm/s)

Generator layer60≤2.5
Turbine layers60≤2.5
New pouring concrete
 0~3 d54≤1.5
 3~7 d54≤3.0
 7~28 d54≤7.0