An Analysis of the Impact Exerted on Bearing Capacity of Pier and Pile after Increasing Pile Cap Height

Table 1

Natural vibration period and vibration mode of Shougang Bridge before and after cap rise cap.

Modal numberRaise 0 mRaise 1 mRaise 2 mRaise 3 m
Natural periodMode shape descriptionNatural periodMode shape descriptionNatural periodMode shape descriptionNatural periodMode shape description

12.184Along-bridge2.123Along-bridge2.05Along-bridge1.898Along-bridge
20.809Across-bridge0.858Across-bridge0.855Across-bridge0.775Across-bridge
30.161Vertical torsion0.168Vertical torsion0.175Vertical torsion0.178Vertical torsion
40.147Vertical torsion0.15Vertical torsion0.151Vertical torsion0.143Vertical torsion
50.075Along-bridge0.081Along-bridge0.088Along-bridge0.076Along-bridge
60.072Vertical torsion0.071Vertical torsion0.07Vertical torsion0.065Vertical torsion
70.035Vertical torsion0.035Vertical torsion0.035Vertical torsion0.034Vertical torsion