Research Article

Construction Process Simulation and In Situ Monitoring of Dendritic Structure on Nanjing Niushou Mountain

Figure 4

Self-balancing elevating scheme. (a) lifting the first small branch; (b) lifting the first small branch to design position and anchoring cables; (c) installing the second small branch; (d) installing the third small branch; (e) assembling the big branch horizontally; (f) lifting the big branch to design position.
(a)
(b)
(c)
(d)
(e)
(f)