Research Article
Study on Seismic Reliability of UHVDC Transmission Systems
Table 1
Seismic reliability calculation of monopole subsystem.
| Post-earthquake capacity | Monopolar subsystem condition | Calculation formula |
| 100% | All is well | |
| 75% | Only one CTV fails | |
| 50% | Only one DC fails and the CTVs connected with the runnable DC are well | | Both DCs are well, but 2 CTVs fail | |
| 25% | Only one DC fails and one of the CTVs connected with the runnable DC fails | | Both DCs are well and 3 CTVs fail | |
| 0% | Both DCs fails | | Only one DC fails and the two CTVs connected with the runnable DC fail | | Both DCs are well and CTVs fail | |
|
|
represents the number of combinations. |