Research Article

Behavior and Control of the Ballastless Track-Subgrade Vibration Induced by High-Speed Trains Moving on the Subgrade Bed with Mud Pumping

Table 6

The vertical vibration displacement of the ballastless track-subgrade after mud pumping has been reinforced.

Testing contentVertical vibration displacement (mm)
The ballastless track-subgrade without mud pumpingThe ballastless track-subgrade after mud pumping reinforcement
Location (upper to lower)Track slabConcrete baseSubgrade surfaceTrack slabConcrete baseSubgrade surface

Train moving speed (km/h)2500.290.130.060.310.180.06
2800.340.170.070.370.200.09
2830.390.210.080.420.270.10