Pseudodynamic Testing of Buildings Retrofitted with External Steel Reinforced Concrete Frames to Increase Lateral Strength for Earthquake Damage Prevention
Table 2
Construction procedure for the bolted ESRCF strengthening system.
Sequence
Construction procedure
1
Boring of anchoring hall
2
Installation of anchor plate
3
Tightening of slit plate bolt, connection device welding
4
Fixing of anchor plate, epoxy sealing, injection, and filling
5
Installation of rebar, fixing concrete cast in place