Research Article

Linkage Analysis between Solid-Fluid Coupling and the Strength Reduction Method for Karst Cave Water Inrush in Mines

Figure 17

The water pressure distributions in the roadway by pipe analysis analysis in different times. (a) t = 0.14 h. (b) t = 3.53 h. (c) t = 9.44 h.
(a)
(b)
(c)