Research Article
Study on the Vibration Effect of Short Footage Blasting Load on Surrounding Rock-Support Structure of Tunnel
Table 5
Peak value of vibration velocity at each measuring point of profile 1-1 (10−2 m/sec).
| Blasting times | Arch bottom | Arch top | Left arch waist | Right arch waist |
| 1 | 13.034 | 12.422 | 12.624 | 12.524 | 2 | 27.952 | 25.452 | 26.857 | 26.732 | 3 | 29.654 | 28.765 | 28.354 | 28.968 | 4 | 29.877 | 29.745 | 28.976 | 29.983 | 5 | 32.745 | 32.657 | 31.345 | 31.987 |
|
|