Research Article
Foundation Treatment Assessment and Postconstruction Settlement Prediction of a Loess High Fill Embankment: A Case Study
Figure 17
Relationship between Sf/H and H under different average compaction degrees. (a) During the intermission period (1143.6 m). (b) During the completion period (1158.5 m).