Research Article
Foundation Treatment Assessment and Postconstruction Settlement Prediction of a Loess High Fill Embankment: A Case Study
Figure 19
Cracks and doline between the boundary of the fill and the excavation. (a) Cracks between the fill and the foundation soil. (b) Cracks in the fill. (c) Doline in the fill.
(a) |
(b) |
(c) |