Research Article

Foundation Treatment Assessment and Postconstruction Settlement Prediction of a Loess High Fill Embankment: A Case Study

Figure 19

Cracks and doline between the boundary of the fill and the excavation. (a) Cracks between the fill and the foundation soil. (b) Cracks in the fill. (c) Doline in the fill.
(a)
(b)
(c)