Foundation Treatment Assessment and Postconstruction Settlement Prediction of a Loess High Fill Embankment: A Case Study

Table 1

PCS estimation formulas of fill embankment from case studies.

ReferencesRelationship between crest PCS and fill height of the embankment

[29]Germany and Japan: , where S (m) is the crest PCS of fill body, H (m) is the height of fill embankment
Lawton formula: , where S (m) is the crest PCS of fill body
Gu Weici formula: Empirical coefficientkmn
Concrete-faced rockfill dam0.0043311.7461.2045
Earth dam with inclined core0.00981.47551.0148
Core wall dam0.0161.09320.876
Russia formula: , where t (days) is the duration of PCS, St (mm) is the crest PCS of fill body
[30]Longbao Airport in Guiyang and Dali Airport in Yunnan:, where E(MPa) is the deformation modulus of high fill, where S (mm) is the crest PCS of fill body
[26], where S (mm) is the elastic modulus of high fill
[27] (λ ≥ 0.85), S = 0.7-1.0%H, where S (m) is the crest PCS of fill body
[28]Longdongbao Airport: , where S (mm) is the crest PCS of fill body
Dali Airport: , where S (mm) is the crest PCS of fill body