Foundation Treatment Assessment and Postconstruction Settlement Prediction of a Loess High Fill Embankment: A Case Study

Table 3

Foundation soil treatment methods.

SectionsAreas (m2)Treatment methodsAbbreviations or symbols

DCA20 m × 20 mSingle-point DC-2000 kN · m (TT = 10–12), TD = 3.5 m; TD/4-overlapping DC-800 kN·m (TT = 3-5)DC-dynamic compaction
B20 m × 20 mSingle-point DC-2000 kN·m (TT = 10–12), TD = 4.0 m; TD/4-overlapping DC-800 kN·m (TT = 3-5)VSGP-vibrating sinking gravel pile
C20 m × 20 mSingle-point DC-3000 kN·m (TT = 10–12), TD = 4.0 m; TD/4-overlapping DC-1000 kN·m(TT = 3-5)PSCP-plain soil compaction pile
D20 m × 20 mSingle-point DC-3000 kN·m (TT = 10–12), TD = 4.5 m; TD/4-overlapping DC-1000 kN·m (TT = 3-5)TD-tamping distance
E20 m × 20 mSingle-point DC-6000 kN·m (TT = 10–12), TD = 4.5 m; TD/4-overlapping DC-1000 kN·m(TT = 4-6)TT-tamping times
F20 m × 20 mSingle-point DC-6000 kN·m (TT = 10–12), TD = 5.0 m; TD/4-overlapping DC-1000 kN·m (TT = 4-6)

VSGPG20 m × 15 md= 0.5 m, l = 1.5 m, L = 10–18 m (average value = 15 m)d-pile diameter
H20 m × 15 md= 0.5 m, l = 2.0 m, L = 10–18 m (average value = 15 m)l-pile spacing; L-pile spacing

PSCPK20 m × 15 md= 0.5 m, l = 1.5 m, L = 10–18 m (average value = 15 m)
L20 m × 15 md= 0.5 m, l = 2.0 m, L = 10–18 m (average value = 15 m)