Research Article
Study on Combined Energy Absorption Support for Rockburst Disaster Control in Tunnelling
Table 4
Calculated working conditions.
| No. | Working condition | Steel pipe size Dt (mmmm) |
| 1 | No hollow steel pipes | ā | 2 | Q235 steel pipes | 501 | 3 | Q345 steel pipes | 501 |
|
|