Research Article
Reliability Assessment on Pile Foundation Bearing Capacity Based on the First Four Moments in High-Order Moment Method
Table 1
Five- and seven-point estimates corresponding to the estimating point and weight.
| | Estimation point | Weights |
| Five-point estimate | u0 = 0 | p0 = 0.53333 | u1+ = −u1− = 1.35563 | p1+ = p1− = 0.22208 | u2+ = −u2− = 2.85697 | p2+ = p2− = 1.12574 × 10−2 | Seven-point estimate | u0 = 0 | p0 = 0.45714 | u1+ = −u1− = 1.15441 | p1+ = p1− = 0.24012 | u2+ = −u2− = 2.36676 | p2+ = p2− = 0.03076 | u3+ = −u3− = 3.75044 | p3+ = p3− = 5.4826910−4 |
|
|