Research Article
Research on Control of Rib Spalling Disaster in the Three-Soft Coal Seam
Table 3
Two grouting time and position of working face.
| Grouting time | 2019-09-06 | Total | 2019-09-09 | Total |
| Grouting position/# support | 25# | 29# | 31# | 33# | 35# | 5 holes | 34# | 37# | 40# | | | 3 holes | Grouting volume/barrel | 46 | 28 | 40 | 40 | 30 | Totaling 5.1 tons | 60 | 30 | 60 | | | Totaling 4.2 tons |
|
|