Research Article

Analysis of the Risk Path of the Pipeline Corridor Based on System Dynamics

Table 3

Consistency test of the risk path of integrated pipeline gallery.

Level 1 risk categoryLevel 1 risk categoryLevel 1 risk categoryLevel 1 risk categoryLevel 1 risk category

R1(0.342 0.206 0.118 0.269 0.065)0.057–0.051Yes
R2(0.564 0.061 0.249 0.126)0.172–0.192No
R3(0.316 0.074 0.139 0.472)0.043–0.048Yes
R4(0.106 0.584 0.310)-0.014–0.024Yes
R5(0.302 0.380 0.252 0.067)0.809–0.898No