Research Article
Analysis of the Risk Path of the Pipeline Corridor Based on System Dynamics
Table 4
Risk judgment matrix of comprehensive pipe gallery.
| Level 1 risk category | Level 1 risk category | Level 1 risk category | Level 1 risk category | Level 1 risk category |
| R2 | | (0.533 0.086 0.181 0.200) | −0.011–0.012 | Yes |
| R5 | | (0.261 0.334 0.281 0.124) | 0.033–0.037 | Yes |
|
|