Research Article
Optimization of the Hollow Rectification Sill in the Forebay of the Pump Station Based on the PSO-GP Collaborative Algorithm
Figure 9
Surface flow field diagram of each plan: (a) plan 1, (b) plan 2, (c) plan 3, (d) plan 4, (e) plan 5, (f) plan 6, (g) plan 7, and (h) plan 8.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |