Research Article

Study on Overburden Stability and Development Height of Water Flowing Fractured Zone in Roadway Mining with Cemented Backfill

Table 6

The calculation of water flowing fractured zone height Hm.

Formula one (m)Formula two (m)

19.4∼30.635

Note. is the cumulative mining thickness.