Research Article

Optimization and Application of Spacing Parameter for Loosening Blasting with 24-m-High Bench in Barun Open-Pit Mine

Figure 13

15 m × 5.5 m effective stress of the section between the front holes at different times. (a) t = 1.99 ms. (b) t = 43.49 ms. (c) t = 144.00 ms.
(a)
(b)
(c)