Research Article

A Case Study on the Deformation of Metro Foundation Pit in Silt Stratum in North China

Table 3

The energy increment of each step.

ItemsConstruction steps
2345

∆P (J/m)4.219.42538.74553.82
∆W (J/m)3.959.00535.2452.775
∆U (J/m)0.260.060.0750.035
∆V (J/m)00.3653.431.01
∆U/∆P (%)3.090.320.0950.035
∆V/∆P (%)01.9354.4250.94