Abstract

Soldier pile support is an important tool for supporting deep foundation pits in the sand-gravel layer. However, since the sand-gravel layer itself is an aggregate of particles, its noncontinuity will cause extremely complex changes in the properties of the surrounding soils during pile supporting, and the changes in the mechanical properties of the soil behind the piles can also affect the safety and stability of the pit. To study the changing pattern of the surrounding soil in the course of pile supporting, we used the numerical method to simulate an excavation in the sand-gravel layer, followed by an analysis of the movement and stress distribution of the surrounding rocks. A photoelastic experiment was carried out to simulate the excavation process and study the force chain network of the surrounding soil as well as its changing characteristics. As shown by the results, (1) during the excavation of a deep foundation pit supported by soldier piles, on the same horizontal plane, the force chain changed most dramatically at the position that was 13.8 m (depth of the foundation pit) away from the edge of the foundation pit; (2) during the excavation, the force chain structure of the surrounding soil changed from vertical development to both vertical and horizontal developments; when there was a hard rock layer at the bottom of the soldier piles, the supporting effect of the piles was mainly provided by the hard rock layer; (3) the free face should be reinforced, and the excavation face should be adjusted based on the underground conditions of surrounding buildings (structures).

1. Introduction

Excavating or supporting a deep foundation pit in the sand-gravel layer is extremely difficult because of some basic issues involved, such as internal stability, external stability [1, 2], deformation [35], seepage [6], and structural form selection [79]. Especially for excavations in soils with multiple sand and gravel layers, problems exist such as high cost, easy deformation of the supporting structure, and adverse impacts on the environment. For instance, a foundation pit collapsed in the sand-gravel layer below a residential building in Yuxi, Yunnan Province, in 2009, causing loss of life and property. During the excavation in the sand-gravel layer at a Beijing metro station in 2010, due to design defect, noncompliant construction, the failure to monitor in time, and other reasons, the supporting structure of the deep foundation pit fell, resulting in casualties. In February 2012, cracks appeared in the foundation pit of a municipal project in Wuhan City and spread rapidly, eventually leading to the collapse of the pit. These cases remind us that further research is still needed to meet the safety requirements for excavating deep foundation pit in the sand-gravel layer.

The research on foundation pit involves physicomechanical issues at macro and micro levels. Traditionally, soil is often treated as a continuous medium from a macroscopic perspective. Terzaghi [10] pointed out the continuous medium method’s limitations back in the early twentieth century. Yang [11,12] believed that the basic comprehension of rock mechanics must also begin with knowing the granular nature of rocks and soils; it is uniquely advantageous to study the force chain network structure and the evolutionary process during excavation from the particle point of view. Zhou [13,14] used PFC to build a particle flow model for supporting the side slope of a foundation pit and adopted the discrete element method to study the pit’s internal mechanical properties. The simulation of a project conducted by Jia [15] using a discrete element software showed great consistency with the monitoring data. With the discovery of photoelastic materials, photoelastic experiment has become an effective method to study the internal force chain of granular media. Kruyt and Radjai [16] mentioned that force chains can be divided into strong and weak ones and analyzed their structural forms. Kondic [17] described the force chain network with topological invariants. Meanwhile, the discrete element software PFC is also a useful instrument to study particle aggregates such as gravel soil [18, 19].

Scholars have conducted research on the soil of the sand-gravel layer. Li [20] studied the propagation of hydraulic fractures in glutenite and concluded that the presence of gravels increased the possibility of propagation and that gravels affected the macroscopic heterogeneity of the rocks. Ni et al. [21] built two simplified models and compared their respective seepage by using the classic sectional combination method and considering the seepage refraction law separately. The results suggested that the model with the seepage refraction law was more practical. Through similar model tests, He [22] discovered the development pattern and structural failing process of the cracks when the tunnel was under stress, as well as the stress differences with or without the grouting reinforcement ring. Wang [23] conducted an experiment to explore the relationship between the permeation coefficient and the gravel soil porosity. The results suggested that the permeation coefficient experiment was of great practical significance for the in-depth exploration of the combined element forecast model initiated by debris flow. Chen et al. [24] studied the gravels’ permeation pattern in the debris flow source regions. Zhou’s [25] research revealed a relationship between the permeation coefficient of gravel soils and the initial void ratio of soil and fine particle content. Alikarami et al. [26] crushed quartz sand and other gravel particles with X-rays to form a shear zone and analyzed its characteristics. Cao [27] gives an analytical solution for the resistance of saturated soil on the side of the pile based on the normal stress assumption.

The above-mentioned studies on gravel soils certainly have significant implications. However, most studies focused on the propagation of cracks in the sand-gravel layer, the permeation pattern, and the void ratio. There are still some unresolved issues in the complexity and particularity of the sand-gravel layer. For example, if the gravel soil is taken as an aggregate of particles, how should we determine the size and direction of its internal force chains? [2830]. For another example, when a deep foundation pit is excavated on the sand-gravel layer, is there any special effect the soil has on the supporting structure.

Judging from the noncontinuous and heterogeneous physiomechanical state of the gravel soil, the authors simulated the excavation process of a deep foundation pit in Chengdu through PFC and photoelastic experiment, emphatically analyzed the force chain network structure of the surrounding soil during the excavation in the sand-gravel layer, and quantitatively described the force chain network structure of the soil and the supporting structure.

2. Overview of the Project

This foundation pit was located in the Phase-II project of a hospital in Chengdu. Geological exploration data showed the site’s leveling elevation on the north side of the pit was 517.25 m to 517.95 m, and the excavation depth was 13.8 m. Municipal sewage and rainwater pipelines are crossing under this section. The maximum burial depth of the pipe bottom was -5.0 m.

The solums on the project site consisted of the fill layer, the sandstone layer, and the pebble layer. The underground water on this site was mainly the pore water in the quaternary alluvial-diluvial sand-gravel layer. The water-bearing layers were the sandstones and the pebbles layers, the latter of which features a good water permeability. As shown by the geological exploration data, the average bulk density of the surrounding soil was 18,000 kN/m3, there were buildings near the foundation pit, and the additional load at the edge of the pit was about 20 kN/m.

2.1. Foundation Pit Support Scheme

Since the project is quite close to the surrounding buildings, their stability should be regarded as an important issue. Soil nailing might damage the foundation of the surrounding buildings. Based on our experience in foundation pit projects in this region and considering the environmental conditions of this project, the soldier pile support was applied, with the pile diameter of 1.2 m, the pile spacing of 2.0 m, the pile length of 26.8 m, and the burial depth of 13 m.

3. PFC Simulation of the Deep Foundation Pit Supported by Soldier Piles

A numerical simulation analysis was performed with the PFC2D particle element software to study the microscopic mechanical characteristics, including changes of the surrounding soil during excavation, and to record the interactions between the soil and the pile.

3.1. Establishment of the Basic Particle Flow Model
3.1.1. Model Size

Due to symmetry, half of the simulated foundation pit was selected for the study. The model length was 46 m and the width was three times of the pit depth (36 m). The specific size is detailed in Figure 1.

3.1.2. Selection of Model Parameters

Circular particles were used for simulation. To reduce particle deformation’s impact on the results, we set the stiffness and shear strength at 1e9 N/m. The piles were horizontally bonded, 22 balls with a radius of 0.6 m were used to simulate the piles, and the particles were bonded horizontally. The specific parameters are shown in Table 1.

3.1.3. Soil Simulation

The soil was formed by generating particles with a small radius, setting the density, and filling the space with the radius expansion method. Firstly, the number of particles was determined. The total area was 46 × 36 m2, the porosity of the soil was known to be 0.72, and the number of particles N can be calculated through the following formula:

S-particle represents the average area of particles. The average radius of particles was 0.045 m and the particle area was 0.0063 m2. The number of particles was determined to be 39,000.

50,000 particles numbered from 1 to 50,000 were generated within the area of 46 × 36 m2 to ensure the particles can be distributed throughout the area. The particles’s density was set at 18,000 kg/m3, the stiffness at 1e9 N/m, the intensity at 1e9 N/m, and the friction coefficient at 0.5. The particles were allowed to fall freely after the gravity was set. The particles were expanded with the radius expansion method, and when the model reached equilibrium, ball particles above the model width of 36 m were deleted.

The rock layer at the pile bottom was simulated as follows: the above particles were reinforced at the range of X (0,46) and Y (11,14) at the bottom of the model to make the soil in the coordinate region set in a parallel bonding mode. After the model became stable, the simulation of the foundation soil was formed.

3.1.4. Simulation of Boundary Conditions

The simulation of the upper load is as follows: the upper load was 20 kN/m and the model length was 46 m, so the total upper load was calculated at 720 kN. The upper load was generated by uniformly placing high-density particles on the upper part, so 36 balls with a radius of 0.5 m were placed within the range of 0 to 36 m. The density of the balls was 2.56 kg/m3, so the upper load was 720 KN. The model is shown in Figure 2.

3.2. Data Monitoring

To find out the movements of the surrounding soil during the excavation in loose soil, we need to monitor the displacement of particles at the pile top and in the surrounding soil. Meanwhile, if we want to study how the force chain of the surrounding soil evolves, we need to analyze the evolution of the entire force chain diagram and set up displacement monitoring points at the following locations.

Monitoring points were set at places 0 m, 13.8 m (depth of the foundation pit), and 27.6 m (twice of pit depth) away from the supporting structure on the horizontal plane and 5 m and 13.8 m (depth of the foundation pit) away from the ground in the vertical direction. The location of the monitoring points is shown in Figure 3.

3.3. Displacement Analysis

The particles at the pile top in the model had a vertical displacement of 0.052 m and a horizontal displacement of 0.08 m. The field measured data showed that the piles had a vertical displacement of 0.03 m and a horizontal displacement of 0.06 m. A negligible difference was seen between the field measured data and the simulated data, indicating this simulation was a successful one and reasonable model parameters and pile bonding mode were selected.

An analysis of the displacement field reveals that foundation pit excavation is a complicated process. The displacement of the particles behind the supporting structure changed from downward movement to horizontal movement during the excavation. The displacement field of positions near the ground changed dramatically. The displacement field had little changes in the place 13.8 m (depth of the foundation pit) below the ground, especially in the place 26.8 m (depth of the supporting structure) below the ground. On the same horizontal plane, the displacement field witnessed bigger changes in the place closer to the supporting structure (as shown in Figure 4).

The particle displacement of the pit surrounding rocks had the following characteristics: within the range of 13.8 m (depth of the foundation pit) away from the supporting structure in the horizontal direction, larger movement velocities were seen in the place closer to the supporting structure. Areas with large velocities were concentrated near the piles in the upper part of the rock layer at the bottom of the foundation pit. Within the range of 26.8 m (length of the supporting structure) away from the ground in the vertical direction, the particles at the bottom of the excavated foundation pit moved upward in an uplift state. This suggested that, during excavation, the largest soil displacement was seen in areas at the intersection of the excavation face and the rock layer. From the analysis results, it can be concluded that the choice of excavation interface has great influence on the soil behind pile. As a result, it is necessary to take proper measures such as drainage, reinforcement, and sectional excavation before construction to avoid foundation pit instability caused by soil movements.

3.4. Stress Monitoring

The force chain values of monitoring points are shown in Table 2. In the same vertical direction, the force chain of the place 13.8 m away from the edge of the supporting structure witnessed the largest change. The internal force of the place 27.6 m away from the pit’s edge had the smallest change during excavation.

In the same horizontal direction, the mean force chain value in the place 13.8 m from the ground was the largest. The stress of the lower particles was greater than that of the upper ones because the force chain had carried all the particle gravity.

The force chain value changed the most in the place 13.8 m away from the foundation pit. This indicated that the soil in the place 13.8 m from the piles had the largest stress change during excavation. From the analysis results of the monitoring points, it can also be concluded that the choice of excavation interface has a great influence on the soil behind the pile.

4. Photoelastic Experimental Simulation on the Excavation of the Deep Foundation Pit Supported by Soldier Piles

Judging from the noncontinuous and heterogeneous physiomechanical state of the gravel soil around the project, we simulated the excavation with a photoelastic experiment to analyze the structure and evolutionary characteristics of the force chain network and quantitatively describe the force chain structure and its changing pattern.

An appropriate similarity ratio was established based on the maximum size and load limit of the experimental machine. The model width was 760 mm and the length similarity ratio was taken as 47, equivalent to the actual length of 35.72 m. The actual formation density was 1.8 g/cm3, the photoelastic material density was 1.2 g/cm3, and the density similarity ratio was 1.5. The soil of 36 m × 36 m was simulated in a bidirectional loading and bidirectional flow device of 76 cm × 76 cm. The layout is as follows. The excavation section was filled with circular particles. Square particles were laid at the bottom (52–58 cm) to simulate the rock layer. The pile length was 65 cm, the depth of the foundation pit was 38 cm, the piles were 15 cm away from the right discharge port, and the pile was of the same height as the particles. 70 N servo pressure was applied on the left side and 200 N servo pressure was applied on the left side of the pile top. The excavation was simulated by the discharge of circular particles from the discharge port. The schematic diagram of equipment is shown in Figure 5.

The experimental process is as follows: the excavation consists of two phases, that is, excavation and support. Limited by the experimental conditions, this paper only focused on studying the characteristics and evolutionary pattern of the force chains behind the piles in the surrounding soil during excavation. Since the size of the particle discharge port of the photoelastic device was 5 cm, the excavation depth that can be simulated each time was 2.35 m. The excavation process of foundation pit is shown in Table 3.

4.1. Research on Force Chain Direction

Force chain diagram of foundation pit excavation process is shown in Figures 69. Rose diagrams were obtained by using MATLAB to analyze and process the above force chain diagrams. For instance, 18° was set as an interval. Compared with the data before excavation, the number of force chains after the excavation in the horizontal direction (-9°–9°, 81°–90°, and 152–170°) reduced by 28, or 9 in each interval on average, and reduced by 5 in the vertical direction (81°–98°); the number of force chains in the middle direction (9°–27°, 27°–45°, 45°–63°, 63°–81°, 98°–116°, 116°–134°, and 134°–152°) increased by 13, or 2 in each interval on average, as shown in Figures 10 and 11. Only vertical and horizontal loads were applied in this experiment. This suggested that, in granular media, when the vertical and horizontal loads remained unchanged, the number of strong force chains was reduced in both vertical and horizontal directions during excavation, and such chains were turned towards the direction where no stress would be applied. This was because after the foundation pit was excavated in the sand-gravel layer, the crustal stress was released, and a large rebound deformation began to occur towards the free face. From this, suggestion can be made that, during the excavation of foundation pit in the soil composed primarily of loose gravels with a free face, the soil should be reinforced by grouting, steel wire mesh laying, or other means, to prevent the soil from collapsing towards the free face or the direction with little stress (the foundation pit accident in Beijing mentioned in the Introduction was caused by a similar situation).

4.2. Diagrams of Force Chains behind Piles

The following characteristics can be obtained during excavation by quantitatively extracting the force chains behind the piles:(1)Before excavation, the force chains took the shape of small ends and a large middle. After the second excavation, the force chains in the square particles were constantly strong, and the force chain reached the strongest in the place near the top of the square particles. As the excavation proceeded, this force chain strength basically remained unchanged and the strength was greater than that of the bottommost layer. This indicated that when there was a rock layer at the bottom, the embedding force of the piles was mostly provided by the hard rock layer near the bottom. It is thus suggested that the pile bottom should be rested on the rock layer during construction if conditions permit. Refer to Figure 12.(2)After each excavation, in the place 1.5 cm above the bottom end of the excavation (corresponding to about 0.5 m in the actual situation), the force chain value reached the maximum within that short interval. In the meantime, we found that as excavation continued, the force chain value of the previous excavation interface remained the maximum in the short interval. This suggested that the selection of the interface bottom had continuous impacts on the surrounding soil. The excavation bottom should not be set on vulnerable planes to prevent important buildings or structures from being affected.

5. Conclusion

The following conclusions can be obtained by analyzing the force chains of the soils surrounding the foundation pit supported by soldier piles during excavation:(1)The displacement field analysis showed that displacements were concentrated on the places 13.8 m (depth of the foundation pit) away from the supporting structure horizontally and 26.8 m (length of the supporting structure) vertically. Stress analysis suggested that, in the same horizontal direction, the least stress change was seen at the point 27.6 m away from the foundation pit. In the same vertical direction, the largest stress change was recorded at the point 13.8 m away from the piles.(2)Structural analysis of the force chain diagrams indicated that, during excavation, the force chains of the surrounding soils changed from mainly vertical development to both vertical and horizontal developments. Force chains developed more in the direction without direct stress. When excavating a foundation pit composed primarily of loose gravels, the soil should be reinforced by grouting, steel wire mesh laying, or other means, to prevent the soil from collapsing towards the free face or the direction with smaller stress.(3)Compared to other supporting means such as bolting support, soldier pile support is often considered to have fewer disturbances to the surrounding environment. As can be seen from the simulation, the force chains within the range of 13.8 m changed considerably, indicating that soldier pile support also significantly impacts the surrounding environment within the range, especially on the internal stress of the underground soil. The excavation face selection dramatically influences the stress of surrounding objects, so it is suggested not to set up an excavation face on the same horizontal plane as the vulnerable object to prevent threats to neighboring pipelines and buildings (structures).

Data Availability

The datasets generated and analyzed in the current study may be obtained from the corresponding author upon reasonable request.

Conflicts of Interest

The authors declare no conflicts of interest.

Authors’ Contributions

Jiang Xie conceived, designed, and performed the study. Xiaojia Lu collected and analyzed the example used in the paper. Jiang Xie, Liu Yang, and Xiangang Han wrote and revised the paper together. The authors have read and approved the final published manuscript.

Acknowledgments

This work was supported by the National Key R&D Plan Project (2017YFC1503104).